The restoration of this stunning Grade II* property took two years and included designing six main reception rooms, 20 bedrooms, bathrooms and all auxiliary areas. We co-ordinated the work with tradesmen to strip some of the rooms back to a totally blank canvas. Careful restoration was then needed to refurbish the fabric of building before the new interior schemes could be installed. We worked with experienced craftsmen and women to create bespoke details such as ornate wood carvings and hand-made trimmings.